Project location:Xinjiang
Project nature:Station heating, large space heating area heating
Optional equipment:Low temperature air source heat pump unit
Project Overview:The building area of Hami Railway Station is 9997.56 square meters, and the central heating building area is 1000 square meters. H.Stars provides a heating solution for boiler renovation, providing high-temperature hot water heating from 65 degrees to 80 degrees. Using low-temperature air source heat pump units can save 70,000 yuan a year compared to using natural gas boilers.