Project location:Xinjiang
Project nature:Clean workshop, plant central air conditioning
Optional equipment:Flooded chiller, combined air conditioner
Project Overview:The production workshop area of Sinopharm needs a clean air-conditioning system. The industrial chiller + combined air-conditioning unit is used to ensure all the temperature and humidity requirements for production. The clean air-conditioning design and equipment installation of the production workshop are contracted. Huge running costs.