+86 18665672648
Global Projects
Global Projects
your location: Home>Global Projects>Pharmacy>Zhongkang Hospital Central Air Conditioning + Central Hot Water Project
Zhongkang Hospital Central Air Conditioning + Central Hot Water Project
Zhongkang Hospital Central Air Conditioning + Central Hot Water Project
Zhongkang Hospital Central Air Conditioning + Central Hot Water Project
Project location:Guangdong
Project nature:Central air conditioning, central hot water
Optional equipment:Dual-source heat pump heat recovery unit, evaporative cold and heat recovery chiller
Project Overview:The Zhongkang Hospital project has a construction area of 12,000 square meters and a total of 9 floors. For the needs of air conditioning and hot water, it adopts a dual-source heat pump heat recovery unit for stars, an evaporative cold and heat recovery chiller, and an intelligent water heater to supply air conditioning and free heat in summer. Water, heating in winter; intelligent hot water mechanism hot water in winter.
Inquiry

TEL:

+86 18665672648

Copyright© 2022 H.Stars (Guangzhou)Refrigerating Equipment Group Ltd